Overview

Service Name

Design Revision (Preliminary, Final, Building Modification, Fit-Out, Temporary Construction, Demolition, Others)

Design Revision (Preliminary, Final, Building Modification, Fit-Out, Temporary Construction, Demolition, Others)

Description This service enables the customer to apply for modification on the approved design, including but not limited to: changing the number of parking, elevation design and structural drawing without affecting the entire building structure

Details

Requester
  • For Preliminary, Final and Building Modification: Consultant
  • For Temporary Construction, Demolition and Fit-out: Contractor
Service Deliverables Stamped Drawings
Service Request Channels
  • Online
  • Customer Service Center at Dubai Studio City - Commercial Building 1 - Ground Floor
Service Hours
  • Online: 24/7
  • Customer Service Centre:

     Monday to Thursday from 7:30 am to 2:30 pm.

     Friday from 7:30 am to 12 pm.

Estimated Time to Deliver
  • For Preliminary: 4 Working Days
  • For Final, Building Modification, Temporary Construction, Demolition and others: 5 Working Days
  • For Fit-out: 3 Working Days
Service Fees
  • AED 1,000 + AED 1.0 ft2 (for any additional built-up area) if approved
An additional fee of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction
Required Documents For Preliminary
  • Approved and proposed drawings (as per Circular no. 400) highlighting the changes
For Final or Building Modification
  • Approved stamped drawings and proposed drawings (as per Circular no. 400) highlighting the changes (Architectural, Structural and Mechanical)
  • Structural calculations and model (applicable for Structural revisions)
  • NOC from relevant local Authority (if applicable)
For Fit-out For Temporary Construction
  • Approved and proposed drawings (as per Circular no. 400) highlighting the changes
  • NOC from relevant local Authority (if applicable)
For Demolition
  • NOC from relevant local Authority (if applicable)
Notes
  • Site Plan must be valid at the time of submission
  • An approved concept design does not exempt the consultant from adhering to Mechanical and Structural requirements in subsequent design stages